Last original lab renovated

The last of the “original” labs in Dorothy Roebling Building is under full renovation. The former lab of Dick Lee has been totally demolished and the interior walls have been removed to make the space a single open space.  In order to retain the low ceiling which conceals ductwork and piping, a 26 foot long 12 inch wide  laminated beam is being installed to support the high sidewall.

Harry Carter adjusts the fit of the laminate beam.

Harry Carter adjusts the fit of the laminate beam.

Completion of this project is planned for October 2015.  The renovated space will be occupied by new faculty member, Julia Diaz.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s